I have a truck load of top soil sitting in my back yard. Using shovels and wheel barrows (which I provide), the soil needs to be transferred to my garden terraces, very close to the pile. I guess it might take 2 people 3-4 hours to do this, or one person 7-8 hours. There could also be removal of some invasive English ivy from under some trees if they are done early enough with the top soil (or this could be a separate job at a later time).